PML-C

PML-C 3

PML-C is a concrete structure. Rigid full width platform enable it work under
heavy and frequent use, good performance against bad weather conditions. Steel cross PML-C 2beam makes load cell installation& maintenance easy and quick. It can be installed on both pit and surface foundation.

 

Features:

* Concrete deck, durable for heavy load capacity

* Longer use, less maintenance

* Good performance against bad weather conditions

* Steel cross beam for easy load cell installation

* Modular design, easy for installation and maintenance

* Suits load cell KELI ZSFY/QS, ZEMIC HM9B/BM14G, TOLEDO PDX/0782, FLINTEC RC3, VISHAY 116…

* Customized requests are available

Dimension Capacity (t) Dimension Capacity (t) Dimension Capacity (t)
3x8m 30-60 3.2x8m 30-60 3.4x8m 30-60
80 80 80
3x10m 30-60 3.2x10m 30-60 3.4x10m 30-60
80 80 80
3x12m 60 3.2x12m 60 3.4x12m 60
80 80 80
3x14m 60 3.2x14m 60 3.414m 60
80 80 80
3x16m 60 3.2x16m 60 3.4x16m 60
80 80 80
100-120 100-120 100-120
3x18m 60 3.2x18m 60 3.4x18m 60
80 80 80
100-120 100-120 100-120
Special requirement for dimensions available